Since the ore body is located close to the surface, it will be mined by open pit method.
Solvent Extraction (SX)
This technology for copper extraction from ore is the most cost-effective and environmental-friendly.
Electrowinning (EW)
This technology for copper extraction from ore is the most cost-effective and environmental-friendly.
Final product - Copper Cathode LME grade A 99.99% Cu
Characteristics: Copper sheets sizes: 1150 MM X 1012 MM; Weight: Not less than 65.2 kg; Package: Cathodes packed with steel line (Aluminum Band) in packets.
Training of employees on the biodiversity status was held
On 29.09.2016 a training course was held for the employees in Sardich MC’s branch office in Pirava, and on 21.11.2016 a training course was held for the employees of the contractor, Fabrika Karposh, on the biodiversity status within the project area.