+389(2)3066002 info@copin.mk

Download full version of this Press Release:

EN (PDF) EN (PDF) MK (PDF) MK (PDF) RU (PDF) RU (PDF)

During 2017, blasting, loading, crushing of copper ore located on the upper floors of the mine, as well as its sorting, transportation and placement on leaching heaps for further processing were carried out.

By the end of the year, more than 100 thousand tons of copper ore were placed on the heaps.